Second Life has been down all day, so I really haven’t known what to do with myself. I have a meeting with everyone in about 10 minutes, so I figure I’ll get working after that. In the mean time, I figured I’d post my activities log over the past couple of days before it becomes too backed up:
6/11/07
*Modified platform so the ramps are as big the standing area
*Added a guardrail to the back of the platform
*Attended the ASL Scripting 201 class
*Textured inner walls of the room
*Created and placed the vehicle “bubbles”
Spending:
*$10 – Tip for ASL 201 scripting class
*$10 – Upload of black jeans image
*$10 – Upload of another black jeans image
————————————————————-
6/12/07
*Attended the ASL Scripting 202 class
*Discussed many ideas with Dr. Polack
*Built, positioned, and linked the vehicle signs
Spending:
*$20 – Tip for ASL 202 scripting class
*$10 – Upload of Car-Alone Sign
*$10 – Upload of modified car alone sign
*$10 – Upload of public transportation sign
*$10 – Upload of motorcycle sign
*$10 – Upload of bicycle/walk sign
*$10 – Upload of car group sign
*$10 – Upload of another motorcycle sign
*$10 – Upload of carpool sign
*$1000 – Payment for black mannequin